Case Studies
one6
SHLD Firewall systems vs. traditional cinder block
the challenges

the solution
Reduce time and tradespeople on the job site by replacing cinder block assembly with pre-fabricated SHLD Firewall assembly.
the results
Hours with crane
Each manufactured in a climate-controlled facility to avoid weather delays.
A completely cinder block and concrete-free solution!
hours on-site
SHLD firewall panelized systems made it possible to fully install 3 shafts in 7.5 hours!
reduced labour
Off-site manufacturing systems reduced on-site trade requirements to only four installers.
Less equipment
Eliminated the need for scaffolding, hoarding and only required one crane to complete.
time & cost savings
The fast installation and low on-site labour demands lowered overall project costs.